EnginMenu
Explore Engin

What are you
working on?

Services, project experience, tools and practical guidance.

EngineeringStage 4/5 contractor designEngineeringM&E validation surveysEngineeringFault findingToolkitEngineering calculators & resources
Search this website · ⌘ / Ctrl KPrefer a conversation? Talk to Ben ↗
Explore services ↓See projects ↓Scroll to follow / Illustrative film
Illustrative review of drawings and outstanding design information
02 / A typical starting point

Won the job.
Need the detail?

Bring your Stage 3 package. We’ll agree what needs developing for procurement and installation.

Illustrative inspection of existing mechanical services
03 / Bring site into the design

Check the site.
Develop the design.

Review access, retained services and installation constraints before the detail is fixed.

Illustrative site team reviewing drawings and services coordination
04 / Technical design

Develop the detail.
Connect the interfaces.

Connect drawings, calculations and schedules with the wider team and programme.

Illustrative contractor working on installed mechanical services
05 / Construction support

On site?
Keep decisions moving.

Work through technical queries and agreed design changes as construction progresses.

Illustrative project team discussing a services installation
06 / Delivery

A designer to call.
Through delivery.

Work directly with Ben through the agreed design and site support.

Work directly with Ben Design informed by site Scope and fee agreed first
Choose your next step

Where can
we help?

01 / Develop the design

Bring the package
you have.

Develop inherited information into the agreed technical design, with procurement and installation in view.

Inside the work01 / Design
Hevacomp model excerpt from a London office mechanical contractor design proposal
From the model to the detail.London office fit-out · Ben’s earlier contractor experience.
Open the project file
The engineering, revealed

One building.
Every connection.

Air. Water. Power. Explore the systems that need to work together, from technical design to site.

ENGIN / SYSTEM STUDY 01Illustrative building
Choose a system
01 / Coordination

See the
connections.

Plant, routes, space and access. A useful design considers how the services come together in the building.

  • Agree the systems and design responsibilities.
  • Resolve routes and specialist interfaces.
  • Bring installation and maintenance access into the detail.
Explore contractor design ↗

A simplified model to explain our approach, not a project design or simulation.

Inside the system / Interactive inspection

Take an AHU apart.
See what matters.

Dampers. Filters. Coils. Fans. Explore the details behind a useful validation.

Explore the AHU
Illustrative cutaway of an air handling unit showing its componentsScroll inside ↗
Selected project work

Inside the
project files.

Inside the project files32 seconds / Silent film
Real drawings, models and site photographs, brought into motion. Includes Ben’s earlier contractor experience, before Engin Services.
Read the film

Design. Detail. Delivery. Real records. Practical engineering.

  • London office fit-out. Make the existing work. Mechanical contractor design; model excerpt from Ben’s earlier contractor experience, before Engin Services.
  • High-spec drinks company, London. Connect the detail. Record drawings and handover from Ben’s earlier contractor experience, before Engin Services.
  • Hotel and spa refurbishment. Define the next stage. Engin Services MEP tender design; architectural background by the project architect.
  • London office investigation. Get closer to the problem. An anonymised condition-survey photograph, site evidence and proposed remedial scope.

M&E design that works on site. Talk to Ben at enginservices.co.uk.

Explore project experience ↗
Ben of Engin Services
Ben and the team

Design experience.
Site understanding.

Ben leads a team combining M&E design with practical project experience. Talk to Ben about the support your project needs.

Meet the team ↗
Free contractor resource / No sign-up

Stage 3 received. What’s missing?

Review the package, record information gaps and download a checklist for your team.

Engin Services / The briefingMEP · London · Practice

The Engin Journal.

Building services.
A closer look.

News + practical commentaryLatest edition /
Source-led reporting. A contractor’s perspective.Open the news desk ↗
Start the conversation

Tell Ben
what you need.

Share your project, the information you have and your next deadline.

Discuss your project
Call BenDiscuss your project